Past News

All news

Work in Progress - Update

Published: July 14, 2022

• Pool Maintenance improvement – We have switched contractors, and they seem to be doing a better job. There may be some need to close the pool, but we will give a day or two of notice before we do. If you see a situation, please let us know.

• Pool Gates – We have been working on this since for a few weeks now. We will be using a temporary system to help with the gates until the vendor can get the part that is needed. I have been told that both gates are now having different issues. Hopefully, this will fix both gates. More to come.

• Fans at Pool – I was informed that the issue with the fans was a power issue. If you turn the controller to far, they won’t work. I am getting an electrician out to fix the problem.

• Water Fountain at Dog Park – A new water meter will be installed around the first week in August. This should allow the fountains to work.

• Damage to wood pillar in the park – We have had this reported but haven’t been informed where it is. We are still working on this.

• Landscaping – We have given notice to the current landscaper and are getting the new one geared up to start on 9/1. This was a contractual obligation, and could have only been shortened by a few days, but it gives us time to make sure the new contractor is prepared.

If you see something that isn’t on this list, please let us know, and we will include it.

Arcadia Farms HOA

Arcadia Farms HOA

Facebook Twitter DZone It! Digg It! StumbleUpon Technorati Del.icio.us NewsVine Reddit Blinklist Add diigo bookmark